iView Developers  
 
 
Iview Developers
 
Iview Developers
Iview Developers
 
 
 

Green Valley Project Amenities

Amenities provided by the vendors include

 
 

No.

Amenity

Specification

1.

Site Markings

Sites to be marked with corner stones and center stone with site numbers.

2.

Compound Wall

6 Feet height compound wall along with entrance gate and security room.

3.

Road and foot path

40’ and 30’ wide tar roads. And paved foot path on both sides of the road.

4.

Water Supply

Water supply from common overhead tank of 50,000 Lt. capacity. Every site will be provided with one water tapping point.

5.

Rain Water Drainage

2"x1'6" Box type R C C drainage on both sides of the road.

6.

Sanitary System 

Underground drainage system with stone ware pipe and specified inter well man holes and common sewerage treatment tank.

7.

Power Supply
        By
  [Chescom]

Each site will be provided with cable conduits with 3phase line facility to provide in the D B box. And both sides of the road will implement the D B boxes in the specified distance.
TRANS FORMER will be provided in the town ship with appropriate kilo watt.  

8.

Garbage Waste

Electric garbage waste management system.

9.

Club House

A club house with the amenities: Reception area, Games room, Library, Guest bed rooms, Banquet hall, Kitchen, Office Space, Staff quarters, Shower rooms, Common toilets. Free member ship in club house for site owners [5yrs only]

10.

Swimming Pool

Minimum 40 feet x 25 feet with 4’6’’ depth with water filtration plant.

11.

Children’s play area

Separately marked children’s play area with fully loaded amenities and landscaping.

12.

Civic amenities 

Day care center with Montessori 1& 2, Doctor’s consulting room on call [After 30% of occupancy].

13.

Commercial complex

For future projects.

14.

Residential greenery
apartment

For future projects

15.

Avenue Plantation

Tree plantation on sides of the roads for shade and greenery of the layout.

16.

Electric Garbage System

The installation of Electric garbage waste manage system will be charged separately to the plot owners.

 
     
 
  • The decisions to change the specification of amenities subject to the availability of certain materials will be left to the discretion of the promoters.
  • The Vendor has the right to alter the sequence of development process to enable early completion of the project. However any such alteration should be intimated to the plot owners so that they are clear about their payment obligations.
 
 
 
Home | Profile | Current Projects | Online Booking | Contact Us